Toyota Land Cruiser

FJ60, FJ62 and FJ80 1980-1997 of release

Repair and car operation



Toyota Land Cruiser
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
+ 4. Systems of cooling, heating
+ 5. Fuel and exhaust systems
+ 6. System of decrease in toxicity
- 7. Transmission
   + 7.1. Mechanical transmission
   + 7.2. Automatic transmission
   + 7.3. Transfer case
   - 7.4. Coupling, driveshafts, semi-axes and leading bridges
      7.4.1. Technical characteristics
      + 7.4.2. Coupling
      - 7.4.3. Kardanny (е) shaft (ы), reducer and axes
         7.4.3.1. Check of driveshafts and hinges
         7.4.3.2. Removal and driveshaft installation
         7.4.3.3. Kardannye hinges
         7.4.3.4. A blocking nave
      7.4.4. Forward semi-axis and epiploon
      + 7.4.5. Back (forward) bridge
+ 8. Brake system
+ 9. Suspension brackets and steering
+ 10. Body
+ 11. Electric equipment
+ 12. Electroschemes









7.4.3.4. A blocking nave

GENERAL INFORMATION

Nave with manual blocking

1. Conic washer and nut
2. Cap of a nave and laying
3. Lock ring
4. Case of a nave and laying

Details of the coupling of a nave with manual blocking

1, 7. Lock ring
2. Laying
3. Case
4. Flange of a cap of a nave
5. Handle and sealing ring
6. Ball and spring
8, 9. Spring
10. Clamp ring
11. Coupling

Removal and installation

NAVE WITH MANUAL BLOCKING

PERFORMANCE ORDER
1. Rearrange a nave cap in the situation Free (the nave is unblocked).
2. Unscrew bolts of fastening and remove a cap nut together with the coupling.
3. Get a lock ring.
4. Unscrew nuts of the case of a nave.
5. A brass hammer weaken and remove a conic washer.
6. Remove the nave case.
7. If further dismantling of the coupling of a nave is necessary for cleaning, pay special attention to an assembly order of details.
8. Clear all details on one, without breaking their order.
9. Assembly of the coupling execute as it should be the return to dismantling.
10. Assembly is carried out upside-down.
11. Replace all laying and grease shlitsa with universal greasing.
12. Transfer the handle to the situation Free and establish a cap flange so that ears on a flange came into case grooves.

BEING SELF-BLOCKED NAVE

PERFORMANCE ORDER
1. Remove a cap.
2. Unscrew bolts of fastening of a flange.
3. A brass hammer weaken and remove a conic washer.
4. Get a lock ring and remove a nave.
5. Assembly is carried out upside-down.