Toyota Land Cruiser

FJ60, FJ62 and FJ80 1980-1997 of release

Repair and car operation



Toyota Land Cruiser
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
+ 4. Systems of cooling, heating
- 5. Fuel and exhaust systems
   + 5.1. Carburetor engines
   - 5.2. Engines with fuel injection
      5.2.1. Technical characteristics
      5.2.2. Decompression of fuel system
      + 5.2.3. Fuel pump and pressure of fuel
      5.2.4. Gasoline pipe lines and joints
      5.2.5. Fuel pump
      5.2.6. Fuel level sensor
      5.2.7. Air filter
      5.2.8. Cable of a drive of a butterfly valve
      - 5.2.9. System of electronic injection of fuel (EFI system)
         5.2.9.1. Check of system of electronic injection of fuel
         - 5.2.9.2. Units of system of electronic injection of fuel
            5.2.9.2.1. Butterfly valve case
            5.2.9.2.2. Sensor of an angle of rotation of a butterfly valve
            5.2.9.2.3. Regulator of pressure of fuel
            5.2.9.2.4. Valve of a regulator of turns of idling
            5.2.9.2.5. Fuel and nozzle distributor
            5.2.9.2.6. Leveling chamber
+ 6. System of decrease in toxicity
+ 7. Transmission
+ 8. Brake system
+ 9. Suspension brackets and steering
+ 10. Body
+ 11. Electric equipment
+ 12. Electroschemes









5.2.9.2.6. Leveling chamber

Removal

PERFORMANCE ORDER

Prevention

Works are carried out on the cold engine.


1. Disconnect the battery from weight.
2. Disconnect from the chamber all sockets.
3. Disconnect a cable of a drive of a zaslonka and draft of transmission.
4. Remove an arm of a branch pipe of a masloukazatel.
5. Accurately designate and disconnect all vacuum hoses.
6. Disconnect a hose of system of ventilation of a case.
7. Unscrew a bolt and remove an arm (if it is provided).
8. Disconnect and muffle hoses of cooling liquid.
9. Unscrew bolts and remove the chamber.

Installation

PERFORMANCE ORDER
1. Clear and check a condition of the demountable planes of a collector and the chamber. Replace laying of the bottom inlet collector. Establish on an inlet collector the chamber assembled with the zaslonka case. Be convinced of correctness of installation of laying.
2. Wrap fastening bolts to an inlet collector, tighten bolts with the moment specified in (see subsection 3.2.1). Further installation is carried out upside-down.